Sunday, March 18, 2012

Individual Progress report


Josh Henry blog progress reports
  • Week 1:
    • Class organized team. 
    • I’m in a group Called Awesome Inc.
    • Set up the blog’s
    • Set the teams task list
  • Week 2: 
    • Started design on the first website, Teppei and Michael came up with the design for me
    • Luiz and Alistair started on the documents
    • Sean started on getting video footage of the game
  • Week 3:
    •  First set of graphics are done and inserted into the website.
    • Researched ways of implementing a database into the website
  • Week 4:
    •  Came to the conclusion that I needed a .php site so a complete restart of the website was in order
    • Read tutorials on starting a database driven website
  • Week 5:
    •  Continued working on version 2 of the website
    • Started supporting documents
  • Week 6:
    •  Transferred the website to a virtual machine with the database so I could work on the site at Tafe
    • Ran into some errors and restarted the website progressed quite far with it
    • Users can now  create users, login with those users, log out, and download the game after logging in
  • Week 7: (website version 3.0)
    •  Put all of my blog posts into one document for easier organization.
    • Requested more graphics from the multimedia students.
    • We be receiving final graphics next week
    • Worked on the layout of the website. should be final design now.
    • Grimwood Meeting



No comments:

Post a Comment